Road and Bridge Investments
Antares Road CABS Bridge Over Truxton Wash
- FHWA Accelerated Innovation Deployment (AID) discretionary grant
- EDC-2: Alternative Technical Concepts
- $2,019,921 ($448,300 AID grant funded)
Alamo Road Stabilization and Hard Surfacing
- Hard surface 3.79 miles of two-lane roadway
- $2,259,250 (County funded)
Mountain View Road Construction
- Construct 0.75 miles new two-lane roadway
- First continuous alternate route to SR 95 through Fort Mohave, AZ
- $2,928,547 ($732,109 STBG funded)
Northern Avenue Complete Street and Sidewalks
- Rehabilitate 5-lane road section for 2.5 miles to include bike lanes, two crosswalks, V2I traffic signal upgrade, and sidewalk
- $5,596,462 ($4 million Transportation Alternatives Program Fund
Rumble Strips
- 34.4 miles on Pierce Ferry Road, Boundary Cone Road, and Oatman Highway (Route 66)
- $2,074,621 (100% HSIP funded)
LED Raised Pavement Markers Curve Warning Signs
- Countywide installation targeting curves exhibiting fatal and serious crash history
- $462,000 (100% HSIP funded)
Gold Spring and Blue Canyon Shoulder Widening
- Widen pavement section to 26 feet.
- $544,571 ($522,961 HSIP funded)
Sand Hollow Bridge Strengthening
- 1929 historic bridge with present 26-ton live load limit
- Structural evaluation and preliminary plans toward structural rehabilitation
- $330,000 (ADOT Off System Bridge Program)
V2I Enabled Traffic Control Signs
- FHWA Advanced Transportation Technology and Innovation (ATTAIN) discretionary grant and ADOT Smart Grant
- Roadside unit deployments countywide
- $1,250,000 (100% ATTAIN and Smart Grant)