Road and Bridge Investments

Antares Road CABS Bridge Over Truxton Wash

  • FHWA Accelerated Innovation Deployment (AID) discretionary grant
  • EDC-2: Alternative Technical Concepts
  • $2,019,921 ($448,300 AID grant funded)

 

Alamo Road Stabilization and Hard Surfacing

  • Hard surface 3.79 miles of two-lane roadway
  • $2,259,250 (County funded)

 

Mountain View Road Construction

  • Construct 0.75 miles new two-lane roadway
  • First continuous alternate route to SR 95 through Fort Mohave, AZ
  • $2,928,547 ($732,109 STBG funded)

 

Northern Avenue Complete Street and Sidewalks

  • Rehabilitate 5-lane road section for 2.5 miles to include bike lanes, two crosswalks, V2I traffic signal upgrade, and sidewalk
  • $5,596,462 ($4 million Transportation Alternatives Program Fund

 

Rumble Strips

  • 34.4 miles on Pierce Ferry Road, Boundary Cone Road, and Oatman Highway (Route 66)
  • $2,074,621 (100% HSIP funded)

 

LED Raised Pavement Markers Curve Warning Signs

  • Countywide installation targeting curves exhibiting fatal and serious crash history
  • $462,000 (100% HSIP funded)

 

Gold Spring and Blue Canyon Shoulder Widening

  • Widen pavement section to 26 feet.
  • $544,571 ($522,961 HSIP funded)

 

Sand Hollow Bridge Strengthening

  • 1929 historic bridge with present 26-ton live load limit
  • Structural evaluation and preliminary plans toward structural rehabilitation
  • $330,000 (ADOT Off System Bridge Program)

 

V2I Enabled Traffic Control Signs

  • FHWA Advanced Transportation Technology and Innovation (ATTAIN) discretionary grant and ADOT Smart Grant
  • Roadside unit deployments countywide
  • $1,250,000 (100% ATTAIN and Smart Grant)